Sign In | Join Free | My fazendomedia.com |
|
Brand Name : New Era
Model Number : GB/T 3077
Certification : ISO9001,TS16949
Place of Origin : China
MOQ : 5 tons
Price : Negotiation
Payment Terms : T/T
Supply Ability : 3000 tons/month
Delivery Time : 45 days
Packaging Details : Bundles Package, Wooden Box Package
Product Name : Alloy Steel Tube
Delivery Condition : BK,BKW,BKS,GBK,NBK
OD Size : 6-88mm
WT Size : 1-15mm
Standard : GB/T 3077
Application : Automotive parts
Steel Material : 35Mn2
Advantage : Strong mechanical property
Product Name: 35Mn2 Seamless Alloy Cold Drawn / Cold Rolled Steel Tube Automotive Parts Tubing
Material: 35Mn2
Size Range: OD: 6-88mm, WT: 1-15mm, Length: 5.8m/6m, maximal 11.8m
Cold Rolled process on the seamless steel tubes, to reach high accuracy on the OD and WT tolerance
Quality Control:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Rolling, On line inspection
5. Heat Treatment:BKS, GBK, NBK
6. Straightening/Cutting to specified length/Finished Measuring Inspection
7. Quality Testing in own lab with Tensile Strength, Yield Strength, Elongation, Hardness, Straightness, etc.
8. Packing and Stocking.
100% Eddy Current Testing.
100% Size Tolerance Checking.
100% Tube surface checking to avoid surface defects.
Product Name | 35Mn2 Seamless Cold Drawn and Cold Rolled Steel Tube for Automotive Parts |
Material | 35Mn2 |
Delivery Condition | BK, BKW, BKS, GBK, NBK |
Standard | DIN2391 / EN10305-1 / GB/T3077 |
Size Range | OD: 6-88mm, WT: 1-15mm |
Application | High precision purpose, auto parts, oil cylinder, etc |
Round Billet | Bao Steel, Xingcheng Steel, Huai Steel, Zhongtian Steel |
Keyword | Cold Rolled Steel Tube |
Certificate | TS16949, ISO 9001 |
HS code | 7304319000 |
Delivery Time | 45 days |
Packing | Bundles or Wooden Boxes |
FAQ:
1. Can you provide a sample to check the quality?
We can provide free sample with same or similar sizes for you to check tube quality.
You need to in charge of Express costs.
2. How about your production capacity?
3000 tons/Month.
3. What are your terms of payment?
30%TT in advance, Balance to be paid before shipment.
4. Where is your factory?
Jiaxing city, 2 hours away from Shanghai.
5. How can I get the quotation A.S.A.P?
Please send us an inquiry with full details as following,quotation will sent to you A.S.A.P:
1). Tube Standard
2). Steel Grade
3). Tube Size and Size Tolerance
4). Tube length
5). Quantity
6). If any special requirements
6. How about the minimum order quantity?
Normally for one size above 1 ton.
Welcome to contact us! Thanks.
![]() |
Cold Drawn / Rolled Seam Welded Pipe , 35Mn2 Scaffolding Steel Pipe For Automotive Parts Images |